
Add to Cart
Capacity | About 15000 tons per month for the steel sheet and coil products |
Material | SGHC, SGCC, DX51D, Q195, all according to the customer's request |
Standard | JIS G3302 1998, ASTM A653M/A924M 2004, all according to the customer's request |
Surface | Galvanized |
Thickness | 0.12mm-4.0mm, all available |
Length | 6m and 5.8m or as customer's request |
Coating Weight | 30-275g/m2,double side |
Spangle | Big spangle, normal spangle, small spangle, non-spangle |
Technology | Hot Dipped |
Edge | mill edge, cut edge |
Delivery Time | within 15-20 days after receive 30% deposit or depend on Quantity |
Payment Term | T/T, Irrevocable L/C at sight (30% deposit) |
Trade Term | EXW, FOB, CFR, CIF |
Certificate
Q: How can we trust your company? A: We specialize in steel business for many years, you are welcome to investigate in any way, anyway, you can place an order on Alibaba, with trade assurance, which can ensure your payment.
Q. How do you guarantee the quality? A:①We have passed ISO9001, SGS, CE and other certifications; ②Always have pre-production samples before mass production, and always do final inspection before shipment; ③Acceptable third-party inspection
Q: About the product price? A: Due to the cyclical changes in raw material prices, prices vary from period to period. You can consult us, you can communicate with us online through the platform, WeChat, WhatsApp and other platforms, and we will reply within 24 hours. Please give us your requirements and specifications (steel grade, size, quantity, destination port), and we will work out the best price at the first time.
Q: Can I visit your factory? A: Of course, we welcome customers from all over the world to visit our factory. However, some factories are not open to the public.
Q: Can you send samples? A: Of course, we can send samples to all over the world, our samples are free, but customers need to bear the express cost.
Q: How long is your delivery time? A: Generally speaking, our delivery time is within 15-45 days, if the demand is particularly large or there are special circumstances, the delivery time may be delayed.